Reconstruction of Section II of Circular route in the area of Primorskaya recreational district (Northern bypass road of the city of Kaliningrad with reconstruction of the traffic interchange at the intersection with Moskovsky Prospect)
DESCRIPTION:
New site is located in the city of Kaliningrad on PK 181+06 across Guryevskaya Street. The bypass road intersection with Guryevskaya St. is fulfilled at the same level. Renovation project provides for construction of intersection at two levels with passing of Guryevskaya Street under Kaliningrad bypass road without arrangement of any exits.
  • Viaduct schema — 1х24 m
  • Overpass bridge length — 24.60 m
  • Carriageway dimension — 2х(Г-19+Т-0.75) m
  • Total weight of RC deck — 2,038 t
  • Entire volume of RC — 2,445 m³ (including deck – 815 m³)
SCOPE OF WORKS:
  • Design of main structures (work documentation)
  • SAC&D design (work documentation)
 CLIENT:
State Public Institution «Public Roads Administration of Kaliningrad Region 
GENERAL CONTRACTOR:
VAD, Ltd.
DESIGN PERIOD:
  • Work documentation – 2015 
CONSTRUCTION PERIOD: