Traffic interchange at the intersection of Bolshevistskaya street, Krasny prospect, Kamenskaya highwayand Fabrichnaya street in the city of Novosibirsk

PROJECT DESCRIPTION
  • overpass superstructure length — 348.8 m (along the axis of the overpass)
  • overpass diagram: 39+45+42+3х45+48+39 m clear headway of bridge includes six traffic lanes (per three lanes in each direction)
  • dividing strip of the width of 3 m
  • operating aisle 0.75 m
  • continuous beam superstructure with orthotropic carriageway slab, consisting of 6
  • twin steel beams of the height of 1.78 m in cross section is located on the curve of the radius of 500 m and transition curves
  • intermediate piers are located at right angles to the flyover axis
WORK ON THE PROJECT
«Working documentation» stage:
  • design of superstructure of overpass
  • design of SAS&D
GENERAL DESIGNER
JSC «Sibgiprotrans»
GENERAL CONTRACTOR
JSC «Sibmost»
DESIGN PERIOD
2010 — 2012
CONSTRUCTION PERIOD
2010 – 2013