DESCRIPTION
Traffic interchange at the intersection of Krasnoputilovskaya St. with the railway tracks of Avtovo Station — Narvskaya Station. Proposed work boundaries: from Avtovskaya St. to Narodnogo Opolcheniya Prospect. Overpasses over the railroad tracks.
First stage
Flyover near Krasnoputilovskaya St.
- Girder and slab type superstructures
- schema: (5×16.0)+(18.0+30.0+40.0+30.0+2×21.5+4×30)+(11+16.0)+(30.0+36.0+24.0+2×29.0)m
- Overall length – 685 m
Second stage
Flyovers of the right exit from Krasnoputilovskaya St. to Chervonnogo Kazachestva St.
- Continuous composite reinforced concrete superstructures according to the following schema was conceived: (2х2.0+42.0+63.0+32.3+30.0+41.85)+(41.85+4х42.0+63.0+41.8)+
- +(41.8+3х42.0+39.0+22.8)m
- Total length — 800.53m
Flyovers of the left exit from Chervonnogo Kazachestva St. to Krasnoputilovskaya St.
- schema: (3×42.0+63.0+42.0+41.8)+(41.8+3×42.0+63.0+2×42.0)m
- entire length – 594.8 m
SCOPE OF WORKS
‘Design Documentation’ Stage
- general design
- determination of the traffic interchange concept
- design of overpasses structures
- construction technology design
- construction method statement
- Federal Expertise passing
CLIENT
Directorate of Transport Construction of Saint-Petersburg
DESIGN STAGE
2006 — 2008