SOUTH-EASTERN CHORD

Project description:

Construction of a road network with artificial structures and reconstruction of engineering communication within Moscow Ring Road MKAD up to Motorway Solntsevo-Butovo-Varshavskoye Shosse.

Technical Features:

  • total length of roadway network is above 10 km
  • three transportation interchange within MKAD on Simferopolskoey and Varshvskoe Shosse, two motorway tunnels, three viaducts over  the railroad of the Bitza River as well as two underground pedestrian crossings with pair of regular ones.

Work on the Project:

  • design development
  • set of engineering survey

Project documentation Stage:

  • participation in design State Expertise

Working documentation Stage:

  • Technical supervision.

Client:

Moscow State Enterprise of Road and Bridge Administration

General Contractor:

SC  MISK

General Designer:

SC Моsinengprojekt

Design Period:

2021

Construction Period:

2024