DESCRIPTION
City Bridge is being connected Industrial and Zasherninskiy districts of Cherepovets city. It is the first ever built cablestayed Bridge in Russian Federation. Bridge deck structure presented by steel girder structure with cable-stayed system, with five fan type RC approaches. Single A-shaped steel pylon with six pairs of stay cables, located on Pier 2 between spans of 194.2m and 136.5 m.
- Bridge diagram:53.0 + 194.25 + 136.5+ 68.65 + 4 х 68.25 + 52.5 m
- total length of bridge structure – 709.25 m
- A – shaped pylon
- pylon height – 83.5 m
- weight of stay cables – 510 t
- length of stay cables – 16 km
- clearance – 28.4 m
SCOPE OF WORKS
- design of SAC&D
- design of work technology
- development of Method Statements (MS)
- field supervision
CLIENT
Cherepovetskiy Metallurgical Plant
GENERAL CONTRACTOR
‘Mostootryad 61’; JSC ‘Mostostroy 6’
DESIGN PERIOD
1972 – 1976
CONSTRUCTION PERIOD
1976 – 1979