MOTORWAY VINOGRADOVO-BOLDINO-TARASOVKA

Project description:

Turnpike to be designed and constructed within Mitishinskiy and Pushkinskiy municipal districts of Moscow Oblast for the  better service and comfort of motorist to avoid traffic jams on local transportation network plus time saving towards the Highway A104  Moscow – Dmitrov –Dubna and M-8 Holmogory.

Being designed motorway includes engineering transportation structures, earth work, bridges, overpasses, retaining walls, transport interchanges, road junctions, and toll booths with other related objects.

Construction commencement is being arranged from the Highway A-104  Moscow-Dmitrov-Dubna — Povedniki near the village of Afanasovo in the Mytishchi District of the Moscow Oblast.  The end of the roadway is located at the junction with the Lot M-8  Kholmogory  Moscow-Yaroslavl-Vologda-Arkhangelsk.

Work on the Project:

Project Documentation Stage:

  • general design
  • roadway design
  • main structures design
  • technology and assembling design
  • SAC&D development with construction design
  • cost estimation documentation development
  • participation in State Expertise

Work Documentation Stage:

  • general design
  • roadway design
  • main structures design
  • technology and assembling design
  • SAC&D development with construction design
  • cost estimation documentation development
  • participation in State Expertise

General Contractor:

Construction Company VIS

Concessionaire:

ООО PКК

Granter:

Ministry of  Transportation and road infrastructure of  Moscow Oblast

Design stage:

2018 -2019

Construction stage:

2020 -2022