Motorway road with bridge over the Artemovka River

Project description:

Motorway Vladivostok – Nakhodka – Port Vostochniy together with Lot 18 + 500 km plus 40+800 km in Primorsky Krai plus the bridge over the Artemovka River at PK 22+52.95 with the PK 30+93.

Technical features:

  • Road type — IВ;
  • Lanes quantity – 4 (per 2 lanes of each direction);
  • Designated speed – 120 km/h;
  • Roadbed width – 28.5 m;
  • Lane width – 3.75 m;
  • Roadway width – 7.5 m;
  • Emergency lane – 3.0 m;
  • Designated loads — А14; Н14.

Technical features of the bridge crossing:

  • Bridge schema – 2(G-11.5) m;
  • Two technical approaches – 0.75 m;
  • Angle of intersection with the river — 90°;
  • Designated loads – А14 & Н14 based on SP35.13330.2011;
  • Bridge schema 4х(3х42) m;
  • Flyover of 33 m based on the Project 3.503.1-81.

Work on the Project:

Overpasses were developed by the Khabarovsk branch of JSC GiprodorNII back in 2013. Design documentation received a positive conclusion from State Expert Board. While documentation correction procedure, the designers of SC Institute Giprostroymost – Saint Petersburg made proposals for the most cost effective structure optimization.

  • engineering survey;
  • adjustment of engineering survey;
  • development of DD and WD;
  • technical supervision.

Client:

Department of road transportation of Primorskiy Kray

General Contractor:

OOO Transstroymehanizasiya

General Designer:

OOO Transproekt

Design stage:

2020

Construction stage:

2021