Bridge over the Karakum river in line of Niyazov prospect in the city of Ashkhabad, Turkmenistan
PROJECT DESCRIPTION
- bridge diagram – (42+63+42) m
- bridge length – 166 m
- limiting dimension: Г=28 m,(1.0+3х3.5+5.0+3х3.5+1.0) m
- width of sidewalks on each side – 1.0 m three traffic lanes in one direction with the width of 3.5 m, 3 traffic lanes in the other direction, dividing strip of the width of 5 m
- total weight of steel structures of superstructure – 850.7 tonnes
- total weight of reinforced concrete of superstructure – 2680.8 tonnes
- total weight of reinforced concrete of foundations and bodies of piers – 18958.8 tonnes
Retaining walls
- total weight of reinforced concrete of foundations and retaining walls – 4747.5 tonnes
WORK ON THE PROJECT
- general design
- development of architectural solutions
- working project stage
- development of technology of construction
- development of SAS&D
- development of Method Statement
- development of Construction Method Statement
- fulfillment of calculations with development
- of specific technical specifications for design of seismic structures
- technical inspection
- participation in tests
- field supervision
- undergoing of expert examination of Turkmenistan
CLIENT
Directorate for construction of very important
objects of Khyakimlik of the city of Ashkhabad
GENERAL CONTRACTOR
SC ‘PO ‘Vozrozhdenie’
DESIGN PERIOD
2010 – 2012
CONSTRUCTION PERIOD
2011 – 2013