Reconstruction of bridge over the Vuoksa River
PROJECT DESCRIPTION:
Reconstruction of the bridge over the Vuoksa River regarding the project:
‘The motor road from Saint-Petersburg through Priozersk, Sortavala to Petrozavodsk, including the constructed section from Saint-Petersburg Ring Road through Skotnoe to Magistralnaya motor road at the section km 57+550- km 81+000, Leningrad Region’.
- bridge diagram (for each direction) — 1 x 73.0m
- bridge length —28 m
- bridge roadway overall dimension — 2(Г-9)+2х5 m
- total weight of steel (superstructures) — 850 tonnes
- reinforced concrete slab of superstructures — 260.2+252.3=512.5 m³
- total volume of reinforced concrete — 593.8m³
SCOPE OF WORKS:
- development of architectural solutions
- designing of main structures (design documentation and working documentation)
- designing of technology of construction
- designing of SAC&D (design documentation and working documentation)
CLIENT:
‘Sevzapupravtodor’
GENERAL CONTRACTOR:
JSC ‘VAD’
DESIGN PERIOD:
Design documentation – 2011 – 2012
Working documentation – 2014
CONSTRUCTION PERIOD:
2014-2015