Bridge over the Sura River, RF

PROJECT DESCRIPTION

Our new bridge crossing is a part of the M-12 Highway ‘Moscow – Nizhny Novgorod – Kazan’, Stage 6  454 — km 586, Nizhny Novgorod Region, Chuvash Republic (intersection with local road 22K-0162 ‘Rabotki – Poretskoe’ up to the next A-151 Highway ‘Tsivilsk – Ulyanovsk’ ( Stage 1.3 502 –  517 km).

TECHNICAL FEATURES
  • bridge schema: (84+4х126+84)+(4×63) m
  • total length: 930.5  m
  • carriageway schema: 2(G-10.5)
  • sidewalks and technical approaches — none
  • lanes quantity: 4 pcs
  • navigation clearance: 9.5х60 m
WORK ON THE PROJECT

Project Documentation Stage:

  • bridge design development
  • construction traffic management
  • engineering network arrangement
  • exterior illumination design, power supply, drainage schema,
    navigation alarm, transportation safety measures
  • site auxiliary structures plan
  • Method Statement preparation
  • environment safety measures
  • fire safety development
  • construction stage monitoring
  • monitoring design while service stage period
  • estimate documentation development
CLIENT

Federal Enterprise ‘Avtodor’

DESIGN STAGE

2020 – 2022

CONSTRUCTION STAGE

2022  – 2024