Motorway Tunnel, Vladivostok City

PROJECT DESCRIPTION

Motorway tunnel is a part of the bridge crossing over the Golden Horn Bay in Vladivostok on the way connecting the federal road M-60 «Ussuri — Khabarovsk-Vladivostok” with Russki Island”.

TECHNICAL FEATURES
  • tunnel length L=249.5m;
  • number of lanes 2 х 3.50 m;
  • emergency lanes – per  1.0 m in each direction;
  • pedestrian lane  — 0.75 m;
  • tunnel dimension  — 5.4 m;
  • area of tunnel —  4,490.5 m2;
  • volume of RC – 1,7193.2 m3;
  • type of rebar — A-I  72.9 tons ; A-III  1,247.7 tons.
WORK ON THE PROJECT

Stage DD:

  • design development;
  • work technology design;
  • estimation calculation.

Stage WD:

  • general design;
  • estimation calculation.
CLIENT

Department of transportation of Primorskiy Kray.

 DESIGN STAGE

2008

CONSTRUCTION STAGE

2009