Reconstruction of Artillery Bay mooring piers, Sevastopol, RF

Site description:

Mooring Pier N 152

Composite mooring pier

Lot N 1

  • length — 57.75 m
  • width — 4 m (two rows of piled flyover with upper structure of composite RC slabs above the RC cross-beams)

Lot N 2

  • length —  17.6 m
  • width 3 m (concrete mooring pier above the stone foundation)
  • year of construction – 1983

Mooring Pier N 153

  • length —  20  m
  • width 3  m (gravity type embankment)
  • year of construction – 1905
  • year of reconstruction 1954

Mooring Pier N 153А

  • length —  16.0 m, width 3.0 m (gravity type embankment)
  • year of construction – 1905
  • year of reconstruction 1954

Mooring Pier N 154

  • length —  39.88 m
  • width 3.4 m (passenger embankment out of steel ‘Larsen- V’ sheet piles)
  • year of construction – 1983

Mooring Pier N 155

  • passenger
  • length —  49.3/50.4 m
  • width 11.0  (two row anchor structure out of ’Larsen III’ sheet piles)

Western Ramp section:

  • length – 19.95 m
  • width 16.7 m (anchored embankment)
  • year of construction – 1958
  • year of reconstruction – 1990

Mooring Pier N 156

Passenger embankment

Lot N 1

  • length — 7 m
  • width 4 m (gravity concrete structure)

Lot N 2

  • length — 6 m
  • width 4 m (gravity concrete structure)
  • year of construction – 1971

Mooring Pier N 157

  • length – 4 m
  • passenger (three rows flyover on pre-stressed RC piles with  RC upper structure)
  • year of construction – 1971

Technical features:

  • level of responsibility — II
  • class of hydro-technical structure — III
  • power supply category — II

Scope of works:

  • General Design

Client:

‘South Coast’ Ltd

Design Stage:

2021