Reconstruction of Artillery Bay mooring piers, Sevastopol, RF
Site description:
Mooring Pier N 152
Composite mooring pier
Lot N 1
- length — 57.75 m
- width — 4 m (two rows of piled flyover with upper structure of composite RC slabs above the RC cross-beams)
Lot N 2
- length — 17.6 m
- width 3 m (concrete mooring pier above the stone foundation)
- year of construction – 1983
Mooring Pier N 153
- length — 20 m
- width 3 m (gravity type embankment)
- year of construction – 1905
- year of reconstruction 1954
Mooring Pier N 153А
- length — 16.0 m, width 3.0 m (gravity type embankment)
- year of construction – 1905
- year of reconstruction 1954
Mooring Pier N 154
- length — 39.88 m
- width 3.4 m (passenger embankment out of steel ‘Larsen- V’ sheet piles)
- year of construction – 1983
Mooring Pier N 155
- passenger
- length — 49.3/50.4 m
- width 11.0 (two row anchor structure out of ’Larsen III’ sheet piles)
Western Ramp section:
- length – 19.95 m
- width 16.7 m (anchored embankment)
- year of construction – 1958
- year of reconstruction – 1990
Mooring Pier N 156
Passenger embankment
Lot N 1
- length — 7 m
- width 4 m (gravity concrete structure)
Lot N 2
- length — 6 m
- width 4 m (gravity concrete structure)
- year of construction – 1971
Mooring Pier N 157
- length – 4 m
- passenger (three rows flyover on pre-stressed RC piles with RC upper structure)
- year of construction – 1971
Technical features:
- level of responsibility — II
- class of hydro-technical structure — III
- power supply category — II
Scope of works:
- General Design
Client:
‘South Coast’ Ltd
Design Stage:
2021