Section of Ring-Road ‘KAD’ around Saint-Petersburg from Priozerskoe Shosse up to motorway ‘Russia’, Lot No.5

DESCRIPTION

First stage of Ring-Road ‘KAD’ construction around the city of Saint-Petersburg started from Priozerskoe Shosse up to highway ‘Russia’, (PK 750+00 — PK 795+72.43). Lot No.5 with basic features as follows:

  • site location: PK 750+00 & PK 795+72.43
  • entire length: 3,576.85m + Belyaevskiy Arch Bridge over the Okhta River6m
STRUCTURES COMPOSED OF ROUTE

Belyaevskiy Arch Bridge basic features as follows:

  • 4m, Г-19.0 (arch span Lр=160 m)
  • 2m, Г-19.0 (Lp=48.4+63+48.4 m)

Transportation interchange at the intersection of ‘KAD’ with Ryabovskoe Shosse PK 774+62

  • Exit length: 1 — 3 – 737.29 m , Г-9
  • Exit length: 2 — 3 — 717.49 m, Г-9
  • Exit length: 4 — 319.55m, Г-7
  • retaining wall length per Exit 1 — 152,63 m, Г-9
  • retaining wall length per Exit 2 — 142,2 m, Г-9

Viaduct near Rzhevka Railroad Station

  • flyover 1: entire length  — 216.64m, Г-19.0, w=22 m
  • flyover 2: entire length  — 115.92m, Г-19.0, w=21.2 m
  • flyover 3: entire length  — 355.76m, Г-19.0, w=22 m
  • flyover 4: entire length  — 96.70m, Г-19.0, w=21.1 m
  • flyover 5: entire length  — 240.0m, Г-19.0, w=22.5 m
  • flyover 6: entire length  — 236.23m, Г-19.0, w=21.1 m
  • flyover 7: entire length  — 266.44m, Г-19.0, w=22 m
SCOPE OF WORKS

‘Design Documentation’ Stage

  • tender documentation development

‘Work Documentation’ Stage

  • general design
  • total main structures design
  • SAC&D, MS and construction technology design
  • technical supervision
  • Federal Expertise passing
CLIENT

Federal State Institution ‘Directory of Ring Road construction of Saint-Petersburg’

‘Saint-Petersburg-Dorservis Ltd’; JSC ‘MO-19’

GENERAL CONTRACTOR

JSC ‘MO-19’; ‘Flora’ Ltd

DESIGN STAGE

2007 – 2008

CONSTRUCTION STAGE

2008 – 2010