Passway to the South of quarter 15 and to the East of Yuri Gagarin Prospect from Kosmonavtov Prospect up to Vitebsky Prospect, Saint-Petersburg, Russia

 DESCRIPTION
  • grade of design – construction
  • street type – local
  • street length – 0.465 km
  • carriageway area – 4,242 m²
  • area of exits – 442 m²
  • parking lots – 445 m²
  • sidewalks, including the area of restoration – 3,032 m²
  • sidewalks being distant from carriageway – 1,080 m²
SCOPES OF WORK
  • Design Documentation Stage
  • Expertise
  • WD Stage
CLIENT

Construction Committee, Saint-Petersburg

GENERAL CONTRACTOR

GOROD, LLC

DESIGN PERIOD

2012 – 2014

CONSTRUCTION PERIOD

unknown