Lefortovskiy Tunnel as a part of Moscow Ring Road, Russia

PROJECT DESCRIPTION:
  • Fifth longest city tunnel in Europe
  • 3,246 m long
  • Tunnel depth 30 m
WORK ON THE PROJECT:
  • Institute Giprostroymost Saint-Petersburg was involved as a subcontractor in given project to design methodology, structural design, preparation of work documentation, SAC&D plus design of total construction work procedures.