Highways, bridges, interchanges and flyovers in the city of Ashgabat and Akhal velayat

DESCRIPTION

Construction of motorway «East-West» from the intersection of Ring Road with «Ashkhabad-Mary» motorway up to highway «Ashkhabad — Turkmenbashi» with local route to Geokdepe village near Ashkhabad. Traffic interchange at the intersection of South Ring Road up to Turkmenbashi avenue.

FACILITIES AS PART OF THE ROUTE

Seven traffic interchanges at the intersections of the existing highways with average area of 1km² each:

  • Junction at the intersection of Ring Road with the Highway «Ashkhabad—Mary» and railway tracks near the settlement of Gyami
  • Traffic interchange in the area of «PK 160» per connection with bridge structure
  • Transport junction at the intersection of Tretya Pyatiletka Street with Kulieva Street together with the traffic interchange with a new bridge crossing constructed under separate contract
  • Traffic interchange at the intersection of Andaliba Street with Kulieva Street plus connection of the traffic interchange with a new bridge crossing constructed at the site of in-service bridge
  • Traffic junction at the intersection of Niyazova Street and Kulieva Street with linking of the traffic interchange plus the new bridge crossing constructed at the site of the old one.
  • Traffic interchange at the intersection of the motorway «Ashkhabad – Turkmenbashi» with the highway toward Geokdepe and railway tracks Ashkhabad – Turkmenbashi
  • Junction at the intersection of the Ring Road Southern part with Turkmenbashi Prospect
  • Two lots of Ring Road 10 km long
  • Three bridge crossings over the Karakum River with approaches and junctions

All structures are designed with consideration for maximum seismic activity of 9 points and more.

SCOPE OF WORKS
  • engineering survey — geodesic plus hydro-geological (control of the survey as a general designer)

«Design Documentation» Stage

  • General Design
  • passing of state expertise

«Work documentation» Stage

  • development of site architectural decisions
  • design of engineering structures
  • design of roads and traffic interchanges
  • street illumination with electric power supply design
  • landscaping design
  • SAC&D plus construction technology development
  • field supervision
  • technical supervision
  • passing of state expertise
CLIENT

Department of construction in Ahkhabad City

GENERAL CONTRACTOR

ZAO «Vozrozhdenie»

DESIGN STAGE

«Design Documentation» Stage 2009 – 2010

«Work Documentation» Stage 2010

CONSTRUCTION STAGE

2009 – 2012