Golden Horn Cable-Stayed Bridge, Vladivostok, Russia

DESCRIPTION

Bridge Crossing over the Federal motorway M-60 ‘Ussury’ Khabarovsk — Vladivostok — Russkiy Island. Crowned in city center near Gogolya and Nekrasovskaya Streets in Southern part plus Kalinina Street in Northern part of the city. Total length of bridge crossing is 2.1 km.

STRUCTURES COMPOSED OF ROUTE

OVERPASS BETWEEN THE PASSAGE OF GOGOLYA
& NEKRASOVSKAYA STREETS

  • overpass length – 80 m
  • overpass width between railings – 9.4 m
  • area of the overpass – 750 m²

TUNNEL

  • tunnel length – 249.2 m
  • width – 21 m
  • tunnel total area — 2,770 m²

NORTHERN APPROACH FLYOVER

  • material — composite RC
  • total length – 220 m
  • width within barriers – 22.2 m
  • total area – 4,890 m²

CABLE STAYED BRIDGE OVER THE GOLDEN HORN BAY

  • bridge schema: 45+100+2х90+737+2х90+100+45 m
  • main span – steel 737 m
  • anchor span – prestressed cast in-situ concrete
  • total length — 1,387 m
  • pylons height – 227 m
  • main span – 737 m
  • underwater clearance – 60 m
  • girder width between barriers – 29.4 m
  • girder height – 3.5 m
  • weight of stays – 1,845 t
  • overpass total area – 43,030 m²

SOTHERN APPROACH FLYOVER 

  • material — composite RC
  • total length – 123 m
  • width within barriers – 21.4 m
  • flyover total area – 2,620 m²

OVERPASS EXIT ON VSEVOLOD SIBIRTSEVA STREET

  • material – composite RC
  • total length –135 m
  • width within barriers – 9.4 m
  • total area – 1,270 m²

OVERPASS EXIT ON KALININA STREET

  • material — composite RC
  • total length — 135 m
  • width within barriers – 9.4 m
  • total area – 1,270 m²

OVERPASS EXIT FROM KALININA STREET

  • material – composite prestressed RC
  • total length — 135 m
  • width within barriers – 9.4 m
  • total area – 1,440 m2
  • SEA BERTH OF PAСIFIC NAVY (RECONSTRUCTION)
  • total area – 5,400 m²
  • ROAD UTILITY NETWORK WITHIN BRIDGE CROSSING (RECONSTRUCTION)
  • area of carriageway – 76,300 m²
  • landscaping of adjacent areas — 60,700 m²
SCOPE OF WORKS
  • ‘Design Documentation’ Stage
  • fulfillment of design works as a subcontractor
  • bridge construction design
  • passing of Federal Expertise

‘Work Documentation’ Stage

  • general design
  • total main structures design
  • SAC&D and MS development
  • financial estimates
  • technical supervision
CLIENT

Primorskiy Kray Road Department

GENERAL CONTRACTOR

‘TMK Ltd’

DESIGN STAGE
  • ‘Design Documentation’ Stage: 2006 – 2008
  • ‘Work Documentation’ Stage: 2008 – 2010
CONSTRUCTION STAGE
  • 2009 — 2012