Flyover within Piskarevskiy Prospect over the railroad by Piskarevska Station, Saint-Petersburg

DESCRIPTION

Piskarevskiy Prospect Viaduct reconstruction over the Piskarevska Railroad Station including two motorways and one train track with pedestrian tunnel. Total length 1.09 km on the Piskarevskiy Prospect plus 0.8km from Ekaterininskiy Prospect toward Brusova Street.

STRUCTURES WITHIN MOTORWAY

Two motorway flyovers

Highway МР3

  • carriageway – asphalt-concrete
  • schema 25.5+(9.5)-29+(10.55)m
  • roadbed 41.5-45m

Tram viaduct

Pedestrian tunnel near Kurakina Street

  • total length 62m
  • composite structure

SCOPE OF WORKS

«Design Documentation» Stage

  • main structures design
  • architectural solution development
  • construction MS development
  • tender documentation completion
  • Federal Expertise passing

«Work Documentation» Stage

  • general design
  • total main structures design
  • SAC&D development
  • MS design
  • technical supervision
CLIENT

«Trest Lenmostostroy» Ltd

Board of Transportation Directory

GENERAL CONTRACTOR

«Trest Lenmostostroy» Ltd

DESIGN STAGE

2006 – 2007

CONSTRUCTION STAGE

2006 – 2007

Кликните здесь, чтобы добавить текст