Construction of Motorway Western High Speed Diameter, Saint-Petersburg, Russia

DESCRIPTION:
  • Section from Traffic Interchange in the sector of the Ekateringofka River to Traffic Interchange in the area of Shkipersky Protok Street (Stage V of construction) and in the district of Shkipersky Protok Street up to the Right Bank of the Bolshaya Nevka River (Stage V of construction).

Site location – Primorsky, Vasileostrovsky and Petrogradsky city districts.

SCOPES OF WORKS:
  • Design documentation per Cable Stayed Bridge over the Petrovsky Channel
  • Work documentation per Cable Stayed Bridge over the Petrovsky Channel
  • SAC&D
  • MS development and issue
ROAD TECHNICAL FEATURES:
  • Total highway length – 12 km
  • Designated speed – 120 km/h
  • Number of lanes – 8
  • One way carriageway length – 2х50+2х3.75
  • Emergency lane width – 2.0 m
  • Dividing lane width – 5.0m (including emergency lane per 1 m)
  • Road pavement – asphalt-concrete
  • Turn radius – 500 m
  • Minimum convex turn radius – 8,500 m, concave part – 5,000 m
  • Maximum inclination – 36 %
CLIENT & GENERAL CONTRACTOR:

JSC WHSD

CONTRACTOR:

ICA Astaldi Ictas

OWNER:

Northern Capital Highways, Ltd

DESIGN PERIOD:

2013 – 2014

CONSTRUCTION PERIOD:

2011 – to the present day