DESCRIPTION

Reconstruction of the Perm-Berezniki Highway, section of the bridge over the Chusovaya River km 22+157 – km 25+780. Initial part of the above-mentioned section of the Federal highway is located within the city of Perm running along the left bank of the Chusovaya River. Section length is 3.62 km, including the bridge over the Chusovaya River – 1,504 m.

FACILITIES AS PART OF THE ROUTE

Motor road. Approaches reconstruction

  • entire length – 1.98 km
  • number of lanes – 4
  • width of the lane on the approaches – 3.75 m
  • dividing lane width on the approaches – 5 m
  • design speed – 120km/h

New steel girder bridge over the Chusovaya River

  • schema: (4х84)+(84+126+5х147+126+84)m
  • overall length – 1,504.4 m
  • total dimension – 11.5 m
  • entire area – 22,560 m²

two railway overpasses (reconstruction)

 above the new highway

  • new overpasses schema: 9m (reinforced concrete) + 66m (steel) + 9 m (reinforced concrete) +11m (reinforced concrete) + 9m (reinforced concrete)
  • total length of each overpass — 113.34m

old reinforced concrete vehicle overpass above the railway (extension)

  • schema: 6х24m
  • flyover total length — 136.51m
  • overall dimension – 2 х 15.25m
  • viaduct area – 4,859 m²
  • number of lanes – 6

SCOPE OF WORKS

«Design Documentation» Stage

  • general design
  • design of basic structures (bridge over the Chusovaya River and railway overpasses)
  • approaches reconstruction design
  • construction method statement
  • estimate calculation of the motor road section reconstruction
  • presentation of design and estimate documentation to FSI ‘Glavgosexpertiza of Russia’
  • expertise support
  • Federal Expertise passing
CLIENT

State Client — Road Agency of the Perm Region.

GENERAL CONTRACTOR

Automobile Roads Department of the Perm Region

DESIGN STAGE

2007 – 2011

CONSTRUCTION STAGE

2011 – 2014