Choganly Bridge over the Karakum River near A. Niyazova Prospect, Ashkhabad, Republic of Turkmenistan

DESCRIPTION
  • Total bridge schema — (42+63+42) m
  • Bridge length — 166 m
  • Dimension: Г= 28 m, (1.0+3х3.5+5.0+3х3.5+1.0) m
  • Width of both sidewalks – 0 m;
  • 3 one way traffic lanes — width of 5 m, 3 lanes in the opposite way, road divider — width of 5 m
  • Total weight of deck steel structures – 850.7 t
  • Entire weight of deck RC – 2,680.8 t
  • Overall weight of RC of foundations and pier bodies – 18,958.8 t

Retaining walls
Total weight of RC of foundations and retaining walls – 4,747.5 t

SCOPE OF WORKS
  • General Design
  • Design of architectural solutions
  • Working Project Stage
  • Design of Construction Technology
  • SAS&D design
  • Design of MS
  • Construction MS design
  • Analytical assessment of seismic conditions
  • Technical inspection
  • Procedure of testing fulfillment
  • Designer supervision
  • Expert examination of Turkmenistan
CLIENT

Department of construction in Ashkhabad

GENERAL CONTRACTOR

NP ‘Vozrozhdenie’

DESIGN PERIOD


2010 – 2012

CONSTRUCTION PERIOD

2011 – 2013