Bridge over the Karakum river in line of Niyazov prospect in the city of Ashkhabad, Turkmenistan

PROJECT DESCRIPTION
  • bridge diagram – (42+63+42) mŽŽ
  • bridge length – 166 m
  • limiting dimension: Г=28 m,(1.0+3х3.5+5.0+3х3.5+1.0) m
  • width of sidewalks on each side – 1.0 m three traffic lanes in one direction with the width of 3.5 m, 3 traffic lanes in the other direction, dividing strip of the width of 5 m
  • ŽŽtotal weight of steel structures of superstructure – 850.7 tonnes
  • total weight of reinforced concrete of superstructure – 2680.8 tonnes
  • total weight of reinforced concrete of foundations and bodies of piers – 18958.8 tonnes

Retaining walls

  • total weight of reinforced concrete of foundations and retaining walls – 4747.5 tonnes
WORK ON THE PROJECT
  • general design
  • development of architectural solutions
  • working project stage
  • development of technology of construction
  • development of SAS&D
  • development of Method Statement
  • development of Construction Method Statement
  • fulfillment of calculations with development
  • of specific technical specifications for design of seismic structures
  • technical inspection
  • participation in tests
  • field supervision
  • undergoing of expert examination of Turkmenistan
CLIENT

Directorate for construction of very important
objects of Khyakimlik of the city of Ashkhabad

GENERAL CONTRACTOR

SC ‘PO ‘Vozrozhdenie’

DESIGN PERIOD

2010 – 2012

CONSTRUCTION PERIOD

2011 – 2013