Central Ring Road of Moscow Region

Initial Stage of construction. Lot No.1

DESCRIPTION

 Construction of Central Ring Road of Moscow Region (toll road after the completion). Initial Stage of construction. Lot No.1

LOCATION

Moscow Region, Podolsk, Novo-Fominsky District, Domodedovo

SITE:

Construction Indices Lot No.1

  • Ruassian Grade Road IА, length — 49,5 km
  • Designated speed — 140 km/h
  • Lanes quantity — 4 pcs.; 6 pcs(Stage II PK 2.417+09.56 — PK2.912+00)
  • Lane width — 3,75 m
  • Carriageway width — 2×7,5 м ; 2х11,25 м (Stage II PK 2.417+09.56 — PK2.912+00)
  • Emergency lane — 3,75 m
  • Deviding lane — 6,0 m
  • Junctions of different levels — 4 pcs; 5 pcs (Stage II PK 2.417+09.56 — PK2.912+00)
  • Bridge crossings— 50 pcs; 53 pcs(Stage II PK 2.417+09.56 — PK2.912+00)

Standard Temporary vertical loads:

  • per artificial strtuctures А14, Н 14
  • per raod pavment 115 kN

Дорожная одежда капитального типа с асфальтобетонным покрытием

CLIENT:

State-owned  Company ‘Russian Motorway Roads’

GENERAL CONTRACTOR:

AO ‘KROKUS’ 

GENERAL DESIGNER:

AO ‘Institute Giprostroymost Saint-Petersburg’

SCOPE OF WORK:
  • Set of measures preparation reckoning state-of- art structures with utility lines optimization, regarding 1-st Stage of construction with volume required for technical decisions approval via the board of Government Technical Experts Committee.
  • Approval of optimized solutions of ‘Avtodor’ Technical Experts together with presentation materials.
  • Total set of works completion concerning work documentation preparation regarding construction site Central Ring Road of Moscow Region (toll road after the completion) including optimization options, approved by State-owned Company ‘Avtodor’.
DESIGN STAGE:

2016 —  2018

CONSTRUCTION STAGE:

2016 — 2018