Central Ring Road Motorway, Moscow Region

DESCRIPTION:
Construction performance of Central Ring Road Motorway, Moscow Region, Lot No 3.
TECHNICAL AND ECONOMICAL FEATURES:
  • lot length – 105.3km
  • designated speed – 140km/h
  • bridges, viaducts and wildlife crossings – 54 pcs
  • multilevel junctions – 7 pcs
  • underground pedestrian crossing — 1 piece
    Construction Stage I
  • width of embankment – 28.5 — 35m
  • carriageway width – 4 х 3.75m
    Construction Stage II
  • width of embankment – 36 — 42.5m
  • carriageway width – 6 х 3.75m
    Track
    Lot No.3 from Motorway М – 10C ‘Stolitsa’
    up to Motorway М – 7 ‘Volga.’ Two stages of construction are being performed simultaneously
    Schema of Construction Stage I
    1+2х3.75+4+2х3.75+1m
    lanes quantity – 4 pcs
    Schema of Construction Stage II
  • 1+3х3.75+4+3х3.75+1m
  • lanes quantity – 6 pcs
    COMPOSED STRUCTURES PER TRACK:
  • Flyover on PK 311+51.96
  • Flyover on PK 352+65.19
  • Flyover on PK 382+88.55
  • Flyover on PK 389+93.00
  • Flyover on PK 405+54.10
  • Flyover on PK 419+51.40
  • Flyover across MMK on PK 443+27.00
  • Flyover on PK 491+00.93
  • Flyover on PK 506+48.10
  • Flyover on PK 520+16.93
  • Flyover on PK 524+55.00
  • Flyover on PK 543+07.75
  • Flyover on PK 545+60.85
  • Flyover on PK 550+55.10
  • Flyover on PK 554+77.28
  • Flyover on PK 563+04.36
  • Flyover on PK 712+17.50
  • Flyover on PK 731+28.69
  • Flyover on PK 741+51.14
  • Flyover on PK 757+95.00
  • Flyover on PK 778+34.41
  • Flyover on PK 833+98.00
  • Flyover on PK 846+53.66
  • Flyover on PK 850+04.80
  • Flyover on PK 910+10.72
  • Flyover on PK 945+85.50
  • Flyover on PK 978+39.20
  • Flyover on PK 985+26.36
  • Flyover on PK 1014+50.00
  • Flyover on PK 1031+78.60
  • Flyover on PK 1064+50.00
  • Flyover on PK 1117+00.00
  • Flyover on PK 1150+04.30
  • Flyover on PK 1415+12.04

Bridges:

  • Bridge over the Moscow Channel on PK 258+58.93
  • Bridge over a creek on PK 283+50.00
  • Bridge over a creek on PK 368+40.60
  • Bridge over the Kakotka River on PK 386+07.00
  • Bridge over the Olshanka River on PK 412+96.20
  • Bridge over the Vyaz River on PK 474+05.20
  • Bridge over a creek on PK 719+92.77
  • Bridge over the Prorvanikha River on PK 735+83.60
  • Bridge over the Vorya River on PK 816+20.00
  • Bridge over the Pruzhenka River on PK 930+12.93
  • Bridge over Chernogolovka River on PK 1,021+13.07
  • Bridge over a lake on PK 1,037+28.16
  • Bridge over the Zagrebka River on PK 1,086+71.83
  • Bridge over the Klyazma River on PK 1,411+46.90
  • Wildlife and pedestrian crossings:
  • Wildlife crossing on PK 373+14.00
  • Wildlife crossing on PK 432+75.00
  • Underground pedestrian crossing on PK 705+25.00
  • Wildlife crossing on PK 876+75.00
  • Drainage pipe on PK 1,079+3.00
SCOPE OF WORK:
  • paperwork analysis with optimization
  • documentation design ‘Technological and structural features of linear site’
  • main structures design
  • MS issue
  • SAC&D design

Stage ‘Work Documentation’:

  • main structures design
  • construction technology development
CLIENT:

AO ‘DSK Avtoban’

DESIGN STAGE:

2016 — 2017