Bridge over the Artemovka River with viaduct on Federal Highway Vladivostok – Nakhodka – Port Vostochny, Primorskiy Kray

DESCRIPTION:

Viaduct of the Highway

  • our structure is designed  within straight in plane area with a length of 191.8m and on curved area of 1,200m along the roadway axis with transitional curves of 100m per each one
  • total curved area is 379.63m, the entire straight area is 917.8m
  • roadway clearance: 0.75+11.5+11.5+0.75m
  • spans and piers were designed per two-way traffic

Flyover No1

  • schema of structure 45х33m, the entire length – 1,494.36m

Flyover No2

  • schema 8х33+8х32.6+25х33+18+2х33+15+33m. Total length –  1,490.86m
  • girders per 32.6m designed per adjacent piers of two flyovers
  • girders were completed of composite RC
  • deck structure height 1.95m (length 33 and 32.6m)
  • piles quantity – 4 pcs.

Bridge over the  Artemovka River

  • Bridge schema: 4х(3х42)m
  • Total length of the bridge span – 513.5m
CLIENT:

Roadway Department of Primorkiy Kray

GENERAL CONTRACTOR

“Transstroymekhanizatsiya”

DESIGN STAGE:

2013 – 2014

CONSTRUCTION STAGE:

2014 – 2017