Bridge over the Staraya and Novaya Pregolya rivers on the construction of the southern by-road of the city of Kaliningrad (Berlinsky Bridge)

DESCRIPTION

Reconstruction of the bridge over the Staraya Pregolya and Novaya Pregolya Rivers within Southern part of Kaliningrad City Ring Road (Stage II). Construction of new bridge with approaches. Bridge is located on the intersection of Southern part of Kaliningrad Ring Road between Moskovskiy Prospect and Emelyanova Street of Eastern side of the city. The entire length of the bridge structure is 1,490m with basic features as follows:

  • bridge length – 640 m
  • approaches length –850 m
  • bridge schema: (3х27.0)+(36.4+64.5+36.4)+3х(3х27.0)+(36.4+64.5+36.4)+ (3х27.0)m
  • clearance — 2х Г-13,25 with sidewalks per 1.5m
  • total area of the lower bridge section – 10,700 m²
  • cast-in-situ RC piers of piled foundation
  • composite RC deck structures
  • comfortable navigation is being ensured
SCOPE OF WORKS

‘Work Documentation’ Stage

  • general design
  • main structures design: piers, decks, retaining walls, etc.
  • main approaches arrangement
  • SAS&D entire design
  • launching technology over run of river spans
  • technical supervision
  • Federal Expertise passing
CLIENT

Direction of Road Sector of Kaliningrad area

GENERAL CONTRACTOR

JSC ‘USK MOST’

DESIGN STAGE

2011 – 2012

CONSTRUCTION STAGE

2012 – 2013